![Solas TWENTY6 ST-26N Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/solas/twenty6-st-26n/twenty6-st-26n_installation-and-operation-manual_1314191030.webp)
SÓLAS
CONTEMPORARY FIRE
30
ASSEMBLY & INSTALLATION
Installing the Outer Vent Heat Shields and Vent
Termination (Parallel Installation on Outside Wall)
1. Before you install the horizontal vent termination,
you must first install the second halves of the two
telescoping vent pipe heat shields. Each shield half
simply slips over the half you previously attached to the
fireplace mounting plate and can now be seen inside
the vent pass-through in the wall.
2. Install the outer shield first and the inner second. Leave
about 1-1/4” of the shields protruding past the house
sheathing.
3. Install the horizontal vent termination (vent cap). Be
sure the arrow on the cap (if present) is pointing up and
reconfirm that all the vent cap location requirements
per page 18 and the vent manufacturers requirements
are met.
4. Slip the inner and outer vent termination pipes onto
the vent starter pipe taking care to align the inner and
outer pipes to prevent damage.
5. Slide the vent termination (cap) into the siding recess
(or vinyl siding shield) until it bottoms out.
Note: The
rear surface of the vent termination will push the
telescoping vent pipe heat shields inward. When the
vent termination is in place the heat shields will just
touch the rear surface of the termination.
6. Pull the vent cap away from the sheathing and install a
small bead of non-hardening silicone sealer around the
cap perimeter. Push the cap in place.
7. Install the mounting screws (included with the cap) to
hold the vent cap to the sheathing See the venting
manufacturers instructions for the location of the
mounting holes. Typical mounting hole locations
are shown in the adjacent photo. See the venting
manufacturers instructions for more information or if
using the vinyl siding shield.
Mounting
Holes