![Solas TWENTY6 ST-26N Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/solas/twenty6-st-26n/twenty6-st-26n_installation-and-operation-manual_1314191023.webp)
solasfires.com
23
ASSEMBLY & INSTALLATION
Vent Pass-Through (Parallel Wall Installation on an
Outside Wall)
1. An unobstructed wall pass-through is required to allow
for a safe installation of the fireplace vent components.
This will necessitate removal of a portion of the interior
wall covering (e.g., sheetrock or plaster and lath), outer
wall sheathing and outer wall covering and any adjacent
internal wall materials (like insulation).
2. Use a long pilot drill (1/8” diameter) that is held square
and level to the inside wall to transfer the vent pass-
through center location from the inner wall covering
through to the outer wall sheathing and outer wall
covering.
3. Carefully cut the inner wall covering along the template
line and remove the circular wall piece.
Note: It is imperative to note the location of
any plumbing or electrical wiring in the wall
before beginning the installation process.
Consult a plumber or an electrician if there
is any doubt about the location of utilities.
4. Carefully cut the gas supply opening, identified on
the template.
5. Remove any insulation materials from wall in the area
defined by the pass-through hole.