Sig
: The signal strength, received from the modem. A value between 0-5, (0 = no
signal; 5 = excellent signal)
Error message
: per communication connection status failure
Communication Ports Status
D e v P r o t # #
R S 4 8 5 - 1 < S E > < S > < - - >
Z i g B e e < S E > < M P S > < - - >
##
: The total number of slaves detected on the specific port
Dev
: The type of device that was configured to a specific port (based on the port’s
functionality), as follows:
SE
: SolarEdge device (default)
LGR
: Non-SolarEdge logger
MLT
: Multiple devices, such as meters and batteries
PROT
: The protocol type to which the port is set:
For a SolarEdge device:
RS485 protocol
ZigBee protocol
S
: SolarEdge slave
M
: SolarEdge master
P2P
: ZigBee point-to-point
MPM
: ZigBee multipoint master (for the
ZigBee gateway or for load management by
the inverter)
MPS
: ZigBee multipoint slave (for a ZigBee
router card)
For electricity meters, refer to the
application note - Connecting an
Electricity Meter to SolarEdge Devices at
http://www.solaredge.com/files/pdfs/solaredge-meter-installation-guide-
SS
: SunSpec - for a non-SolarEdge logger (monitoring and control)
Chapter 8: User Interface
91
StorEdge Solution with Backup MAN-01-00262-1.5
Содержание StorEdge Solution with Backup
Страница 1: ...Installation Guide StorEdge Solution with Backup For North America Version 1 5...
Страница 40: ...Figure 15 Inverter Covers Chapter 3 Installing the Inverter 39 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 98: ...Chapter 9 Setting Up Communication to the Monitoring Platform 97 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 101: ...Figure 34 Internal connectors StorEdge Solution with Backup MAN 01 00262 1 5 100 Communication Connectors...
Страница 141: ...Figure 47 The battery holder StorEdge Solution with Backup MAN 01 00262 1 5 140 9V Battery Replacement...