When countdown is complete, the inverter enters Production mode and produces
power. The steadily lit green inverter LED indicates this mode.
Step 3: Verifying Proper Activation
After the wake-up time is over, a status screen similar to the following appears on the
inverter LCD panel:
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7 3 7 1 . 9 2 3 4 9 . 3
P _ O K : X X X / Y Y Y < S _ O K >
O N
1. Verify the following:
The green inverter LED is steadily lit.
The ON/OFF indicator on the LCD panel reads ON.
P_OK: XXX/YYY: There is a connection to the power optimizers and at least one
power optimizer is sending monitoring data. Optimizers send telemetries in a
frequency of up to 10 minutes.
S_OK appears, if the inverter is connected to the SolarEdge monitoring platform.
Vac [V] specifies the measured grid AC output voltage.
Vdc [v] specifies the DC input voltage, which should be approximately the
inverter DC voltage (model dependent; refer to the inverter datasheet)
Pac [W] specifies the AC output power produced.
2. Take note of the serial number on the inverter label using the detachable 2D
barcode sticker on each device. This information is used in the SolarEdge
monitoring platform to identify this inverter.
Your SolarEdge power harvesting system is now operational.
StorEdge Solution with Backup MAN-01-00262-1.5
52
Step 3: Verifying Proper Activation
Содержание StorEdge Solution with Backup
Страница 1: ...Installation Guide StorEdge Solution with Backup For North America Version 1 5...
Страница 40: ...Figure 15 Inverter Covers Chapter 3 Installing the Inverter 39 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 98: ...Chapter 9 Setting Up Communication to the Monitoring Platform 97 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 101: ...Figure 34 Internal connectors StorEdge Solution with Backup MAN 01 00262 1 5 100 Communication Connectors...
Страница 141: ...Figure 47 The battery holder StorEdge Solution with Backup MAN 01 00262 1 5 140 9V Battery Replacement...