The following figure shows the connections in the StorEdge Connection Unit:
Figure 21: The StorEdge Connection Unit connections
Installing the 9V Battery and Fuses
A 9V battery is supplied with the inverter accessories. Install the 9V battery in the holder
on the top board of the StorEdge Connection Unit and connect it to the battery pad.
Figure 22: The battery holder
Two 25A fuses are supplied with the high power inverters. Install the fuses in the
holders on the top board of the StorEdge Connection Unit .
Chapter 7: StorEdge Inverter Connections
57
StorEdge Solution with Backup MAN-01-00262-1.5
Содержание StorEdge Solution with Backup
Страница 1: ...Installation Guide StorEdge Solution with Backup For North America Version 1 5...
Страница 40: ...Figure 15 Inverter Covers Chapter 3 Installing the Inverter 39 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 98: ...Chapter 9 Setting Up Communication to the Monitoring Platform 97 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 101: ...Figure 34 Internal connectors StorEdge Solution with Backup MAN 01 00262 1 5 100 Communication Connectors...
Страница 141: ...Figure 47 The battery holder StorEdge Solution with Backup MAN 01 00262 1 5 140 9V Battery Replacement...