Chapter 4: Auto-transformer and Backed-up
Loads Panel Installation (for Backup)
The auto-transformer is used for backup power only, and is not mandatory if using
Smart Energy Management applications only. Refer to the table on page 16.
The auto-transformer connects to the AC side of the inverter. Since the inverter AC
connections are on its right side, it is recommended to position the auto-transformer to
the right of the inverter to simplify wiring.
StorEdge Solution with Backup MAN-01-00262-1.5
40
Chapter 4: Auto-transformer and Backed-up Loads Panel Installation
(for Backup)
Содержание StorEdge Solution with Backup
Страница 1: ...Installation Guide StorEdge Solution with Backup For North America Version 1 5...
Страница 40: ...Figure 15 Inverter Covers Chapter 3 Installing the Inverter 39 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 98: ...Chapter 9 Setting Up Communication to the Monitoring Platform 97 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 101: ...Figure 34 Internal connectors StorEdge Solution with Backup MAN 01 00262 1 5 100 Communication Connectors...
Страница 141: ...Figure 47 The battery holder StorEdge Solution with Backup MAN 01 00262 1 5 140 9V Battery Replacement...