4. Verify that the inverter is configured to the proper country: Press the LCD light
button until reaching the ID status screen:
I D : # # # # # # # # # #
D S P 1 / 2 : 1 . 0 2 1 0 / 1 . 0 0 3 4
C P U : 0 0 0 3 . 1 9 x x
C o u n t r y : U S A 1
5. If required, perform the following additional steps before closing the inverter cover:
Country settings or inverter configuration using the internal LCD user buttons –
Communication options connection – refer to
Setting Up Communication to the
Monitoring Platform on page 96.
StorEdge application configuration - refer to
System Configuration on page 109.
6. Close the inverter cover by tightening the screws with a torque of . For proper
sealing, first tighten the corner screws and then the two central screws. The
following figure illustrates recommended order:
Figure 19: Tightening order of the screws
7. Close the StorEdge Connection Unit internal cover: Attach the cover and secure it by
tightening the four screws with a torque of 1.2 N*m / 0.9 ft.*lb.
8. Make sure the AC Bypass switch in the StorEdge Connection Unit is switched to the
left (position 1).
9. Make sure the backed-up loads AC breaker in the StorEdge Connection Unit is
UP
.
StorEdge Solution with Backup MAN-01-00262-1.5
48
Step 1: Activating the System
Содержание StorEdge Solution with Backup
Страница 1: ...Installation Guide StorEdge Solution with Backup For North America Version 1 5...
Страница 40: ...Figure 15 Inverter Covers Chapter 3 Installing the Inverter 39 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 98: ...Chapter 9 Setting Up Communication to the Monitoring Platform 97 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 101: ...Figure 34 Internal connectors StorEdge Solution with Backup MAN 01 00262 1 5 100 Communication Connectors...
Страница 141: ...Figure 47 The battery holder StorEdge Solution with Backup MAN 01 00262 1 5 140 9V Battery Replacement...