
Figure 2: Power optimizer clearance
When installing modules in a confined space, for example, if installing Building-
integrated photovoltaic (BIPV) modules, ventilation measures may be needed to
ensure the power optimizers are not be exposed to temperatures outside their
specifications.
NOTE
The images contained herein are for illustrative purposes only and may vary
depending on product models.
Step 1: Mounting and Grounding the Power
Optimizers
For each of the power optimizers
(1)
:
1. Determine the power optimizer mounting location and use the power
optimizer mounting brackets to attach the power optimizer to the
support structure (See
Figure 3). It is recommended to mount the
power optimizer in a location protected from direct sunlight. For
frame-mounted power optimizers follow the instructions supplied
with the optimizers, or refer to
https://www.solaredge.com/sites/default/files/installing_
frame_mounted_power_optimizers.pdf
.
2. If required, mark the mounting hole locations and drill the hole.
(1)Not applicable to smart modules.
Chapter 2: Installing the Power Optimizers
25
StorEdge Solution with Backup MAN-01-00262-1.5
Содержание StorEdge Solution with Backup
Страница 1: ...Installation Guide StorEdge Solution with Backup For North America Version 1 5...
Страница 40: ...Figure 15 Inverter Covers Chapter 3 Installing the Inverter 39 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 98: ...Chapter 9 Setting Up Communication to the Monitoring Platform 97 StorEdge Solution with Backup MAN 01 00262 1 5...
Страница 101: ...Figure 34 Internal connectors StorEdge Solution with Backup MAN 01 00262 1 5 100 Communication Connectors...
Страница 141: ...Figure 47 The battery holder StorEdge Solution with Backup MAN 01 00262 1 5 140 9V Battery Replacement...