2. Press the external LCD light button to display the battery status screen, and check that:
l
The battery State is: Discharging / Charging
l
The SOE percentage is decreasing/increasing
l
The PWR value is greater than 0
B S N : X X X X X X X X X I D : 2 4
S O E : 8 9 %
W W W W W
P W R : 3 W
T o t a l : < x > W h
S t a t e : D i s c h a r g i n g
3. Turn the AC back ON from the main distribution panel. The inverter should reconnect loads back to
the grid.
To check Maximize Self-consumption mode:
1. Verify the inverter ON/OFF switch is ON.
2. Turn on as many loads so that consumption is greater than the inverter's maximum AC power.
3. Press the inverter LCD light button to display the Meter status screen and check that import power is
greater than zero:
I m p o r t M e t e r
S t a t u s :
< O K / E r r o r # >
P o w e r [ W ] :
x x x x x . x
E n e r g y [ W h ] :
X X X X X . X
4. Press the inverter LCD light button to display the Smart Energy Management and the Battery status
screens, and check that:
o
State
= Discharging (assuming consumption > PV production ; inverter maximum AC power > PV
production.
o
PWR
> 0
B S N : X X X X X X X X X I D : 2 4
S O E : 8 9 %
W W W W W
P W R : 2 W
T o t a l : < X > W h
S t a t e : D i s c h a r g i n g
5. While the PV modules are exposed to sunlight , verify that the battery is charging properly:
a. Minimize consumption by turning off all the load circuit breakers, except for the inverter.
b. In the inverter LCD check that the Meter status screen is displaying import power close to zero.
c. Press the external LCD light button to display the Battery status screen, and check that:
l
State
= Charging
l
SOE
percentage is increasing
l
PWR
> 0
B S N : X X X X X X X X X I D : 2 4
S O E : 8 9 %
W W W W W
P W R : 2 W
T o t a l : < x > W h
S t a t e : C h a r g i n g
SolarEdge
StorEdge
-Single
Battery/High
Capacity
Installation
MAN-01-00283-1.
1
74
Verifying StorEdge Components Functionality