6. If required, perform the following additional steps before closing the inverter cover:
l
Country settings or inverter configuration using the internal LCD user buttons – refer to
l
Communication options connection – refer to
Setting Up Communication to the Monitoring
l
StorEdge application configuration - refer to
7. Close the inverter cover by tightening the screws with a torque of 9.0 N*m/ 6.6 lb*ft. For proper
sealing, first tighten the corner screws and then the two central screws. The following figure
illustrates recommended order:
Figure 25: Tightening order of the screws
8. Make sure the AC Bypass switch in the StorEdge Connection Unit is switched to the left (position 1).
9. Make sure the backed-up loads AC breaker in the StorEdge Connection Unit is UP.
Figure 26: StorEdge Connection Unit
10. Close the StorEdge Connection Unit cover: Attach the cover and secure it by tightening the six screws
with a torque of 1.2 N*m / 0.9 ft.*lb.
SolarEdge
StorEdge
-Single
Battery/High
Capacity
Installation
MAN-01-00283-
1.1
36
Step 1: Activating the System