Installation Workflow
When installing the StorEdge system, follow this workflow to ensure all the components are connected
and functioning correctly.
Step 1
-
PV system installation
- modules, power optimizers and inverter:
l
Power optimizers - as described in
Installing the Power Optimizers
l
Step 2
-
Backed-up loads panel installation (required for Backup Power only)
: Refer to
the AC Grid and to Backed-up Loads
Step 3
-
Electricity Meter installation (required for Smart Energy Management only)
. Refer to
Electricity Meter Installation
Step 4 - Connecting PV strings (DC) to the inverter -
Connecting the Strings to the Inverter
Step 5
-
Connecting the battery to the inverter and mounting the battery
. Refer to the installation
information in the manufacturer documentation, and to
Step 6 - Connecting AC and backed-up loads to the inverter
- connect the loads (AC), and meter. Refer
to
Step 7 - Commissioning the inverter
- Activate the system and pair the power optimizers. Refer to
Commissioning the Installation
Step 8
-
Connecting to the monitoring portal
Setting Up Communication to the Monitoring Portal
Step 9
-
System Configuration
- Configuring the RS485 bus and StorEdge applications. Refer to
The following flowchart appears throughout this Installation Guide to assist with the installation steps:
SolarEdge
StorEdge
-Single
Battery/High
Capacity
Installation
MAN-01-00283-
1.1
10
Installation Workflow