Status Screens - Operational Mode
Additional presses display the following screens one after the other.
Initial Status
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7 3 7 1 . 9 2 3 4 9 . 3
P _ O K : X X X / Y Y Y < S _ O K >
- - - - - - - - - - - - - - - -
O N
l
Vac [V]
: The AC output voltage
l
Vdc [V]
: The DC input voltage
l
Pac [W]
: The AC output power
Main Inverter Status
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7 3 7 1 . 9
3 2 1 0 . 0
F a c [ H z ] O P s _ O k T e m p
5 0 . 0
1 1
2 8 . 2
l
Vac [V]
: The AC output voltage.
l
Vdc [V]
: The DC input voltage.
l
Pac [W]
: The AC output power.
l
Fac [Hz]
: The AC output frequency.
l
OPs_Ok
: Number of optimizers sending telemetries (indicating that they are paired)
l
Temp [C or F]
: The inverter heat sink temperature
Energy Meter Status
Displays the total energy produced during the last day, month, year and since inverter installation.
D a y [ W h ] :
0 . 0
M o n t h [ K W h ] :
0 . 0
Y e a r [ K W h ] :
0 . 0
T o t a l [ K W h ] :
0 . 0
l
Day
: since midnight
l
Month
: since 1st of the current month until today (inclusive)
l
Year
: since January 1st until today (inclusive)
If a meter (RGM) is connected to the inverter, the following status screen, showing the power and energy
readings, is displayed in addition to the above screen.
If the meter is set to Import, there are two status screens, with the first line displaying: "Export
Meter" or "Import Meter". The following is an example of an export meter status:
E x p o r t M e t e r
S t a t u s : < O K / E r r o r # >
P o w e r [ W ] : x x x x x . x
E n e r g y [ W h ] : X X X X X . X
Chapter 8: User Interface
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
65
Содержание SE7600A-US
Страница 1: ...SolarEdge StorEdge Solution with Backup Installation Guide For North America Version 1 3...
Страница 116: ......