11. Close the Connection Unit external cover: Attach the cover and secure it by tightening the six screws
with a torque of 1.2 N*m / 0.9 ft.*lb.
12. Ensure proper conduit sealing; inspect the entire conduit run and use standard conduit sealants to
avoid water penetration.
13. Turn ON the Connection Unit switch. If an additional external DC switch is installed between the
power optimizers/ battery and the inverter(s) then turn it ON.
A status screen similar to the following appears on the LCD panel:
V a c [ V ] V d c [ V ] P a c [ w ]
2 4 0 . 7
1 4 . 1
0 . 0
P _ O K : 0 0 0 / 0 0 0 < S _ O K >
- - - - - - - - - - - - - - -
O F F
14. Verify that the following information appears on the LCD panel:
l
P_OK
: Appears only upon pairing process completion and first telemetry reception from the
power optimizers. Indicates connection to the power optimizers and that at least one power
optimizer is sending monitoring data.
l
000/000
: Appears only upon first telemetry reception from the power optimizers. Indicates the
number of power optimizers that have been paired to this inverter.
l
S_OK
: The connection to the SolarEdge monitoring platform is successful (should appear only if
the inverter is connected to the server).
l
Vac [V]
: The grid AC output voltage. Verify the correct value.
l
Vdc [V]
: The DC input voltage of the longest string connected to the inverter. There should be a
safety voltage of 1V for each power optimizer in the string.
NOTE
A measurement error on the inverter LCD of ±3 V is acceptable.
l
Pac [w]
: The AC output power (should be
0.0
since the inverter is OFF).
l
OFF
: The inverter ON/OFF switch is in the OFF position.
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
48
Step 1: Activating the System
Содержание SE7600A-US