ATTENTION!
Tous les modules doivent être connectés à un optimiseur de puissance.
CAUTION!
If you intend to mount the Power Optimizers directly to the panel or panel
frame, first consult the panel manufacturer for guidance regarding the
mounting location and the impact, if any, on panel warranty. Drilling holes in
the panel frame should be done according to the panel manufacturer
instructions.
ATTENTION!
Pour installation à même le module ou la monture du module, consultez
d'abord le fabricant du module sur la position et son impact sur la garantie du
module. Le perçage de trous dans le cadre du module devra se faire suivant les
instructions du fabricant.
CAUTION!
Installing a SolarEdge system without ensuring compatibility of the panel
connectors with the Power Optimizer connectors may be unsafe and could cause
functionality problems such as ground faults, resulting in inverter shut down. To
ensure mechanical and electrical compatibility of the Power Optimizer
connectors with the PV panel connectors to which they are connected:
Use identical connectors from the same manufacturer and of the same type
on the Power Optimizers, panels and the inverter DC input; or
Verify that the connectors are compatible in the following way:
The panel connector manufacturer should explicitly verify compatibility
with the Power Optimizer connectors and the Inverter DC input
connectors.
A third-party test report by one of the listed external labs (TUV, VDE,
Bureau Veritas UL, CSA, InterTek) should be obtained, verifying the
compatibility of the connectors.
For more information, refer to
https://www.solaredge.com/sites/default/files/optimizer-input-
Chapter 2: Installing the Power Optimizers
19
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00842-1.3
Содержание RESU10H Prime Series
Страница 81: ......