![SolarEdge RESU10H Prime Series Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/solaredge/resu10h-prime-series/resu10h-prime-series_installation-manual_1313714011.webp)
NOTE
SolarEdge inverters can be installed in sites with an alternative power source
such as a generator. SolarEdge requires installing a physical or electronic
interlock, which will signal to the inverter when the grid has been
disconnected. Interlock procurement, installation, maintenance and support
are the responsibility of the installer. Damage to the inverter due to incorrect
interlock installation or use of an interlock that is incompatible with the
SolarEdge system will render the SolarEdge warranty invalid.
For more information on connecting an alternative power source
to SolarEdge inverter, refer to
https://www.solaredge.com/sites/default/files/se-inverter-
support-of-voltage-sources.pdf
.
WARNING!
Before operating the system, ensure that the been grounded properly.
AVERTISSEMENT!
Avant d'utiliser l'onduleur monophasé, assurez-vous que l'onduleur est
correctement mis à la terre.
WARNING!
When handling the storage system battery, adhere to all manufacturer safety
instructions.
AVERTISSEMENT!
Durant la manipulation de la batterie, adhérez à toutes les instructions de
sécurité du fabricant.
WARNING!
Before connecting the battery to the inverter, power off the battery.
SolarEdge Energy Bank
1. Toggle off the battery ON/OFF/P switch.
2. Turn off the battery circuit breaker.
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00842-1.3
10
IMPORTANT SAFETY INSTRUCTIONS
Содержание RESU10H Prime Series
Страница 81: ......