December 2020
|
Solar Stik
®
, Inc.
34
|
System Setup and Operation Manual for the Solar Stik G-BOSS E Light HPS
PRELIMINARY
Cable
Item #
Cable Name
QTY
A
13-1000292
24VDC 5’ INTERCONNECT CABLE (0 AWG)
2
B
13-0000032
24VDC 5’ INTERCONNECT CABLE (2AWG)
2
C
13-1000293
NOVATIO PARALLEL CABLE
1
D
13-1000187
10’ GENERATOR COMMUNICATION CABLE
1
E
13-1000294
24VDC 5’ INTERCONNECT CABLE
6
F
13-1000298
24VDC SOLAR Y-CABLE
3
G
AIB2-32-5SS
H
NATO Cable
13-1000160
24VDC INTERCONNECT STRIP 7
1
Item #
Component
20-0104029
24VDC PRO-VERTER S 3000-120 EBA2
1
20-0002510
DC POWER DISTRIBUTION MODULE 28V-REG
1
20-0302206
24VDC POWER HUB 3500
1
20-0702604
PRO-Verter RMK (AGS)
1
2 Connect System Components
F
F
F
Energy Storage
24VDC PRO-Verter S 3000
Power Generation
Power Management
1 kW Generator with
Auto-Start/Stop
1 kW Generator with
Auto-Start/Stop
Inter-Connect Strip 7
Saft 6T Batteries
E
B
E
E E E E
D
D
Solar Array (x6)
C
C
C
24VDC Power Hub 3500
A
A
Load
Regulated
DC Load-
PDU
Unregulated DC
Load-
Tower
G
H
AC Load
Optional
PDM 3000
G-BOSS E Light System Connection Diagram
Figure 25. G-BOSS E Light connection diagram and kit inventory
Inventory: Light System