|
39
December 2020
|
Solar Stik
®
, Inc.
System Setup and Operation Manual for the Solar Stik G-BOSS E Light HPS
PRELIMINARY
How to Connect two (2) MPGs in parallel to the PRO-Verter
The PRO-Verter S 3000 has the ability to receive power from two (2) MPGs simultaneously. The
power output from each of two generators is merged into a single “Y” cable that is connected to a
single power input port on the left side of the PRO-Verter (Figure 27). The mode of each generator
is controlled independently and each has its own communication cable to the PRO-Verter. The LED
over each Generator Control switch blinks slowly when functioning in Auto mode, more rapidly when
manual On mode, and very rapidly when there is a generator fault. The LED does not blink when the
switch is in the Off position.
To PRO-Verter
AC input port
Figure 31. Connecting two 1 kW generators in parallel
with the “Y” AC power cable.
Novatio AC
Power “Y”
Cable