i
nstallation and Configuration
4. Get eight (8) M4 screws and eight (8) M4 nuts from the hardware
pack in this kit. Each nut has a locking, nylon insert that begins
gripping the screw when it is halfway tight. Make sure to tighten
the nut and screw completely to ensure locking action. Fasten
the rear member and the front member together using (4) screws
and (4) nuts per bracket assembly as shown in at right. For maxi-
mum support, insert fasteners for each bracket assembly as far
apart as possible, depending on rack depth, while still joining both
members (see figures at right). Check alignment of bracket
assemblies and TIGHTEN ALL SCREWS FROM
Steps 2
and
3
.
5. Prepare the UPS or battery cabinet (the “equipment”) for rack
mounting by following instructions in the equipment’s user
manual. The equipment may require additional parts to be added
or parts to be removed for rack mounting. After it is prepared,
lay the equipment in rack-mounting position. Fasten the inner
members from
Step 1
to the equipment on both sides as shown
at right with eight (8) M4 screws provided in the kit. Make sure
retaining latch is near the rear of the equipment as shown
(see figure at right).
6. Open the grease packet provided in the kit. Apply a 1” long bead
of grease at four (4) places inside the bottom, curved tracks of the
front members as shown below right. The grease will allow the
equipment to slide into the bracket assemblies more easily.
CaUTION
Lifting equipment into the rack may be a two-person job,
depending on the weight of the equipment. (See
equipment’s user manual.)
7. Insert the equipment, with inner members attached in
Step 5
, into
the bracket assemblies by inserting the top and bottom edges of
the inner members into the top and bottom curved tracks of the
front members and sliding the equipment into the rack (see figure
at right). Ends of inner members are tapered to allow the rear of
the equipment to be angled upward before insertion, if
space allows.
Then the rear, bottom edges of the inner members can be placed
into the front edge of the bottom tracks and the front of the
equipment can be tipped up so they are level to insert the top
edges of the inner members before sliding the equip-ment into
the rack (see figure below right). The equipment should move
smoothly into the bracket assemblies. If it does not, recheck the
alignment of the front and rear members from
Steps 2
and
3
.
8. Secure the front of the equipment to the rack mounting rails to
prevent the equipment from sliding out of position. If securing
holes are provided on the front of the equipment that align with
the center holes on the return flange of the front members, you
can use the four (4) extra M5 screws provided in the kit to secure
the equipment. Otherwise, the equipment should be secured to
the front of the rack with four (4) customer-supplied fasteners.
M4 Nuts
M4
Screws
M4 Nuts
18” Rack
Depth
M4 Nuts
M4
Screws
M4 Nuts
32” Rack
Depth
M4 Nuts
Retaining Latch
UpS or Battery
Cabinet
Front
M4 Screws
UpS or
Battery
Cabinet
apply
Grease
(inside)
apply
Grease
...and push it
into the Rack
Insert the UpS into the Front
Members, lift the Front...
12
Содержание S4K6U10000
Страница 1: ...S S4K6U10000 power availability On Line UPS 120 208V 120 240V USER MANUAL...
Страница 2: ......
Страница 46: ......
Страница 47: ......