i
nstallation and Configuration
6.4
Install the Internal Battery packs
To facilitate shipping and installation, the S4K6U10000 ships without the internal battery packs installed. Once the
UPS is installed in place, the internal battery packs must be installed.
17
!
UPStatT
!
UPStation GXT
Battery
Controls and Indicators
(horizontal overlay)
Battery Cover
Front Bezel
!
UPStation GXT
Front of Battery
Battery Connector
Battery
Compartment
Battery Bracket
!
S4K Industrial UPS
!
- +
AC INPUT BATTERY UPS ON
BYPASS
L1
L2
S4K Industrial UPS
!
- +
AC INPUT BATTERY UPS ON
BYPASS
L1
L2
1. Unpack the two internal battery packs from their shipping container.
2. Lift one battery pack from its packaging, holding it in the center of the pack.
3. Align the battery pack so that the cable is at the top right closest to the power module in the frame.
4. Slip the back of battery pack into the battery compartment and slide it in until the battery reaches the back of
the UPS.
5. Install the battery bracket on the front of the battery pack with two screws.
6. Connect the two slotted connectors and tuck the wires in around the battery pack handles.
7. Repeat for the second battery pack.
8. Install the battery cover grille, tightening the three screws.
9. For tower installation, place the vertical overlay over the controls and indicators (see
Figure 9
).
10. Install the front bezels.
Содержание S4K6U10000
Страница 1: ...S S4K6U10000 power availability On Line UPS 120 208V 120 240V USER MANUAL...
Страница 2: ......
Страница 46: ......
Страница 47: ......