initial Startup and electrical Checks
WaRNING
A qualified electrician should install the optional output distribution.
1. Verify that the input feeder circuit breaker is off.
2. Verify that the input and output circuit breakers are off.
3. Verify the UPS is completely OFF.
4. Remove the four screws holding the blank access plate from the rear of the UPS.
5. Connect the four-position Anderson connector of the PAD distribution into the mating connector inside
the UPS.
6. Using the same four screws, attach the PAD distribution option to the rear of the UPS.
7. Verify all distribution circuit breakers are in the ON position.
8. Follow the initial startup procedures listed in
7.0 - Initial Startup and Electrical Checks
.
19
Figure 7
Hardwire terminal connections
INPUT
L1
N
L2
N
L1
L2
OUTPUT
7.2 Output Receptacle Distribution Options
Содержание S4K6U10000
Страница 1: ...S S4K6U10000 power availability On Line UPS 120 208V 120 240V USER MANUAL...
Страница 2: ......
Страница 46: ......
Страница 47: ......