
INSTALLATION
HYD 5K...20KTL-3PH
33
4.5
Tools
Prepare the tools required for the installation and the electrical
connection.
No.
Tool
Model
Function
01
Hammer drill
Recommended
drill diameter:
8mm
Used to drill holes in the
wall.
02
Screwdriver
Wiring
03
Phillips
screwdriver
Used to remove and
install the screws of the
AC terminal
04
Removal tool
Used to remove the PV
terminal
05
Wire stripper
Used to strip the wire
06
6mm Allen key
Used to turn the screw to
connect the rear panel to
the inverter
07
Crimping tool
Used to crimp power
cables
08
Multimeter
Used to check the
earthing
Содержание HYD 10KTL-3PH
Страница 19: ...PRODUCT FEATURES HYD 5K 20KTL 3PH 19 3 4 2 Electrical block diagram ...
Страница 44: ...ELECTRICAL CONNECTIONS 44 HYD 5K 20KTL 3PH 5 3 1 System A direct measurement with CTs ...
Страница 45: ...ELECTRICAL CONNECTIONS HYD 5K 20KTL 3PH 45 5 3 2 System B measurement with energy meter CTs ...
Страница 46: ...ELECTRICAL CONNECTIONS 46 HYD 5K 20KTL 3PH 5 3 3 System C measurement with only an energy meter ...