3-PHASE TRANS FORMER KIT
(6000 DIS PLAYS)
FUNC TIONAL DE SCRIP TION
1
T h e 3 - P h a s e T r a n s f o r m e r K i t e n a b l e s t h e
transformation of the Ship’s 440V, 3-phase supply to
220V/110V for use with Nucleus Radar Displays Type 6000
Series.
IN STAL LA TION
2
To install the 3-phase Transformer implement the
following:
(1) Fix the 3-phase Transformer assembly (HRC -
A190) to the back left corner of the base on the
display console using the 2 self captivating panel
screws (attached to the mounting plate) refer to
Figure 1a.
(2) Locate the washers and fasten the nuts on the M6
studs provided.
(3) Plug the socket into the filter unit.
(4) Remove the cover plate of the assembly to reveal
the terminals and then connect the 3-phase mains
input to TBI on the Transformer.
TEST ING PRO CE DURE
3
Switch ON the mains isolator and using a Multimeter
check the following:
(1) The three phase mains input is 380/440V.
(2) The output voltage is 220/110V as set. Refer to
Figure 2a for link settings.
NOTE:
If the output voltage is not present check FS1.
PARTS
4
Table 4 provides the 3-phase transformer part number
information.
Table 4 – 3-Phase Transformer Parts List
CCT
REF.
GRID
REF.
DESCRIPTION
KELVIN HUGHES
PART No.
3-Phase
Transformer
NNR - A322
Isolator Cable
Self Captivating
Panel Screws
Original
8a.1
May 01
KH 2020
Chap 8a
CHAPTER 8A
OPTIONS FOR NUCLEUS 3 RADAR DISPLAYS
WARN ING
DAN GER OUS VOLT AGES ARE PRE SENT ON
THE TRANS FORMER WHEN SHIP’S THREE
PHASE MAINS IS CON NECTED AND LIVE.
Содержание Kelvin Hughes Nucleus 3 5000 Series
Страница 27: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 ii Amdt 1 KH 2020 Index Introduction ...
Страница 73: ...THIS PAGE IS INTENTIONALLY BLANK KH 2020 Chap 2a July 03 2a 6 Amdt 5 ...
Страница 101: ...THIS PAGE IS INTENTIONALLY BLANK May 01 3 6 Original KH 2020 Chap 3 ...
Страница 109: ...THIS PAGE INTENTIONALLY BLANK July 03 viii Amdt 5 KH 2020 Index Chap 1 3 ...
Страница 119: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 x Amdt 1 KH 2020 Contents Chap 4 5 ...
Страница 150: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4b 12 Original KH 2020 Chap 4b ...
Страница 157: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 6 Original KH 2020 Chap 4c ...
Страница 163: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 14 Original KH 2020 Chap 4c ...
Страница 176: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 28 Original KH 2020 Chap 4c ...
Страница 234: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4f 6 Original KH 2020 Chap 4f ...
Страница 257: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4f 30 Original KH 2020 Chap 4f ...
Страница 275: ...THIS PAGE IS INTENTIONALLY BLANK July 03 5 18 Amdt 5 KH 2020 Chap 5 ...
Страница 279: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 iv Amdt 1 KH 2020 Index Chap 4 5 ...
Страница 309: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 xiv Amdt 1 KH 2020 Contents Chap 7 8 ...
Страница 355: ...May 01 7c 18 Original KH 2020 Chap 7c CD 2412 Figure 15c Control PCB Links Switches Potentiometers and Test Points ...
Страница 356: ...Original 7c 19 May 01 KH 2020 Chap 7c CD 2413 Figure 16c Modulator PCB Switches Test Points ...
Страница 357: ...May 01 7c 20 Original KH 2020 Chap 7c CD 2414 Figure 17c Rx Monitor PCB Links Switches Potentiometers Test Points ...
Страница 359: ...THIS PAGE IS INTENTIONALLY BLANK May 01 7c 22 Original KH 2020 Chap 7c ...
Страница 381: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 7d 26 Amdt 1 KH 2020 Chap 7d ...
Страница 425: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8a 22 Original KH 2020 Chap 8a ...
Страница 445: ...THIS PAGE INTENTIONALLY BLANK July 03 8aA 16 Amdt 5 KH 2020 Chap 8a Annex A ...
Страница 463: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8c 12 Original KH 2020 Chap 8c ...
Страница 472: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8c 22 Original KH 2020 Chap 8c ...
Страница 476: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8d 4 Original KH 2020 Chap 8d ...
Страница 498: ...THIS PAGE IS INTENTIONALLY BLANK Original 8e 19 May 01 KH 2020 Chap 8e ...