2 Transport &
installation
Vision MKII
20
Connecting refrigeration system between
display cases
Refrigeration pipes and valves are prepared under
the display case.
Pipes, copper, sealed under moderate
pressure (0.5 bar).
Diameter depends on display case length
and cooling capacity (see machine sticker and
cooling capacity).
Soldering and connection of a refrigeration
system may only be done by a nationally
certified, authorized professional.
Connecting water supply between display
cases
(if equipped with humidifier).
Water line connections are prepared under the
display case (
∅
6 mm).
Connect the line that comes from the water
filter system in the first display case to the
quick connect on the humidifier in the next
display case section.
No leakage
Connecting drain system between display
cases
The drain system is prepared under the display
case (PVC
∅
40 mm).
Connect the drain between the two display
cases with a plastic sleeve (
∅
40 mm).
Sleeve 40 mm (included)
No leakage
Connection
Sleeve