2 Transport &
installation
Vision MKII
14
Photo of transport beam on serving side, with the
single screw in the metal frame visible.
Placement
See the floorplan for the correct
dimensions.
Make sure the cables and pipes coming
out of the floor do not become pinched under
the display case.
The wooden transport beam can be
detached by removing a single screw from the
serving side of the display case (see figure) and
using a hammer carefully, if the beam is stuck.
Phillips screwdriver
Hammer
Levelling
Level the display case and adjust it to the correct
height using the adjustable feet.
Place the skirting board stand-offs under
the adjustable feet before you level the display
case.
17 mm spanner
Spirit level
Spirit level
Adjustable foot