5.7
Controller Testing and Commissioning
Controller testing and commission can be initiated after the following processes are complete:
•
All sensor modules have been discovered and confirmed in normal operation
•
Display defaults and have been selected and implemented
•
All sensor modules have been calibrated
The Controller is supplied with a set of configuration documents that identify:
•
The planned sensor module numbers, loop connections and alarm levels
•
Commander logic installed to manage the function of all relays
•
Applicable tag names and specific system nomenclature
The definition of the specific actions to test/commission the system, are beyond the scope of this manual
and are normally provided by the specifying engineer or AHJ. In general:
•
Every sensor module input should be stimulated to ensure that the correct display activates
•
Every relay output should be activated via sensor module stimulation to confirm correct action
•
All annunciation devices should be activated via relay activation to confirm visual, audible and
mechanical action is correct
•
All alarm handling devices should be exercised via alarm relay activation
After commission testing, the controller and gas detection system are ready for on line operation.
Содержание Sentry 5000-32-IT
Страница 28: ...Sentry 5000 32 IT Controller Page 28 of 82 Figure 15 Analog Input Wiring ...
Страница 29: ...Sentry 5000 32 IT Controller Page 29 of 82 Figure 16 PSG Sentry Classic Wiring ...
Страница 30: ...Sentry 5000 32 IT Controller Page 30 of 82 Figure 17 Modbus Wiring ...
Страница 31: ...Sentry 5000 32 IT Controller Page 31 of 82 Figure 18 Top Board Relay Digital Output Wiring ...
Страница 32: ...Sentry 5000 32 IT Controller Page 32 of 82 Figure 19 Analog Output Wiring ...
Страница 33: ...Sentry 5000 32 IT Controller Page 33 of 82 Figure 20 Digital Input Wiring ...
Страница 34: ...Sentry 5000 32 IT Controller Page 34 of 82 Figure 21 Bottom Board Relay Wiring ...