TURBINE INSTALLATION
Please follow the instructions supplied
with your turbine.
Secure turbine to turbine rail via hatch
at bottom of fuselage. Leave gap of
25mm between NGV and tailpipe.
Run all turbine wires and power cables
on opposite side of servo wires.
Always secure all wires in harness. I
would suggest you install a FOD. This
will save you money in the long run.
Install fuel pump close to UAT. We recom-
mend to make use of a mechanical shut off
valve as well.
Secure all Festo pipes with cable ties. Make
sure fuel filter and gas canister are mounted
vertical.
Install NiCad or Li Po battery in nose. I al-
ways put a fuse holder inline with power ca-
ble.
Trial fit inlet. When happy glue with silicon. NOTE: Make inlet removable for easy
maintenance.
P-23
Assembly & Operation Manual
Photo 55
Photo 56
Photo 57