Equipment installation is a personal venture. There is one golden rule: Do it as neat
and logical as possible! This will make faultfinding and service of components easi-
er. The Sabre basically consist of 6 circuits!
1. Servo wires
2. Power cables
3. Data cables
4. Pneumatic pipes
5. Fuel pipes
6. RX cable / Satellite Receivers
Please try and separate these circuits as far as possible. It is advisable not to run RX
cables near any kind of electrical fields. Make all switches and filler valves and charg-
ing sockets easy accessible
The Sabre will come out tail heavy if you do not plan installation. It is very important
to install all equipment as far forward as possible.
I have installed 2 x RX + 2 X ECU batteries around inlet ring (photo 65). This is
weight of 1.2 kg together.
I have installed a UAT next to the nose gear retract. This will always be full of fuel
and will help with the final adjustment of CG.
Please wire the accessory tray outside aircraft. It is designed to slide and lock in
position. (note—tidy up wires unlike me :-))
.
Photo 65