Table of contents
Installation and Operating Instructions SINAMICS G180
4
Operating Instructions, 02/2019, 4BS0751-007
3.3.2.7
PTC inputs for motor PTC thermistor..................................................................................... 47
3.3.3
Brake transistor and brake resistor ........................................................................................ 49
3.3.3.1
Dimensioning the brake resistor ............................................................................................ 49
3.3.3.2
Connecting the brake resistor ................................................................................................ 49
3.3.4
Parameter overview ............................................................................................................... 50
3.3.5
"Factory settings" application ................................................................................................. 50
3.3.6
Protective cover IP21 for compact and compact Plus devices .............................................. 51
3.3.7
Main switch "Q 2T..." or "W 2T..." .......................................................................................... 52
3.3.8
DC link terminals for compact devices ................................................................................... 52
3.3.9
External display ...................................................................................................................... 54
3.3.10
RFI suppression filter, category C1 (class B) ........................................................................ 55
3.3.11
Strengthened du/dt filter ......................................................................................................... 55
3.3.12
Sine-wave filter....................................................................................................................... 55
3.3.13
Additional mains power protection chokes ............................................................................ 55
3.3.14
Optional fieldbus connection .................................................................................................. 56
3.3.14.1
PROFIBUS DP ....................................................................................................................... 56
3.3.14.2
PROFINET IO ........................................................................................................................ 57
3.3.14.3
Modbus RTU .......................................................................................................................... 60
3.3.14.4
Modbus TCP .......................................................................................................................... 63
3.3.15
Pre-switch mode power supply 300 W .................................................................................. 65
3.3.16
Water cooling ......................................................................................................................... 66
3.3.16.1
General information about water cooling ............................................................................... 66
3.3.16.2
Direct water cooling diagram ................................................................................................. 67
3.3.16.3
Connecting water cooling ....................................................................................................... 68
3.3.16.4
Venting the water cooling ....................................................................................................... 68
3.3.16.5
Decommissioning and shutdown ........................................................................................... 69
3.3.16.6
Cooling water additives for the closed inverter cooling with cooling unit (optional) ............... 69
4
Preparations for use .............................................................................................................................. 71
4.1
Transporting inverter .............................................................................................................. 71
4.2
Storage of the inverters .......................................................................................................... 74
4.3
EMC ....................................................................................................................................... 75
4.3.1
Install and connect in accordance with EMC. ........................................................................ 75
4.3.2
Examples for correct EMC connection .................................................................................. 76
4.3.3
Radio interference class ........................................................................................................ 78
4.3.4
EMC environment category ................................................................................................... 79
4.4
Realizing operation in the explosion-protected zone ............................................................. 80
5
Installation ............................................................................................................................................ 83
5.1
Installing inverter - General notes .......................................................................................... 83
5.2
Installing compact devices ..................................................................................................... 84
5.3
Protective cover IP21 for compact and compact Plus devices .............................................. 85
5.4
Installing cabinet units ............................................................................................................ 86
5.5
Mounting an external display (option) .................................................................................... 88
Содержание SINAMICS G180
Страница 1: ......
Страница 2: ......
Страница 194: ...Quality documents Installation and Operating Instructions SINAMICS G180 192 Operating Instructions 02 2019 4BS0751 007 ...
Страница 217: ......
Страница 218: ......