To complete the basic commissioning of the Inverter, the following tasks must be completed:
●
Ensure that the Inverter and motor are powered-up (no run command should be issued).
●
Ensure that the Inverter is correctly connected to the PC, using the appropriate
communications cable.
In the project tree under commissioning, select "Control panel". The control panel will appear
at the bottom of the screen.
Image 5-18 Control panel activation
Press the Start [I] button and the motor calculation will be performed. When this has been
completed, the basic commissioning of the Inverter and motor has been completed.
Image 5-19 STARTER control panel
Содержание SINAMICS G110D
Страница 1: ......
Страница 2: ......
Страница 8: ...Table of contents SINAMICS G110D 8 Operating Instructions 07 2016 FW V3 63 A5E36768472B AB ...
Страница 208: ...Messages and fault codes 8 2 LED States SINAMICS G110D 208 Operating Instructions 07 2016 FW V3 63 A5E36768472B AB ...
Страница 223: ......
Страница 224: ......