● 4.5 mm screwdriver
● Insulation stripper
Procedure
The following procedure describes an example of how to contact the shield. You can also use
the enclosure features to connect the shield.
1. Install the standard mounting rail ET 200iSP in the enclosure (clearance to the ET 200iSP:
approx. 40 mm).
2. Strip the installation from the cable in the area of the standard mounting rail (approx. 40
mm).
3. Secure the cable to the standard mounting rail with the shield clamp (torque: 0.8 to 1.2
Nm). Make sure that the shield clamp contacts only the cable shield.
4. Repeat steps 2 and 3 if you need to connect other cable shields.
①
Standard mounting rail for shield support
②
Ex e terminal
③
Shield terminals
④
Ground bus PA
Figure 5-10
Connecting cable shields
Connecting standard mounting rail with ground bus PA
1. Strip the cable for the ground connection (from 4 to 16 mm
2
) and fasten to the standard
mounting rail using the ground terminal (torque: 2 to 2.5 Nm).
2. Connect the other end to the ground bus PA.
Wiring
5.4 Wiring the ET 200iSP
ET 200iSP
Operating Instructions, 11/2017, A5E00247483-07
121
Содержание SIMATIC ET 200iSP
Страница 82: ...Configuration options 3 18 Redundancy with IM 152 ET 200iSP 82 Operating Instructions 11 2017 A5E00247483 07 ...
Страница 184: ...Commissioning and Diagnostics 6 8 Diagnostics with STEP 7 ET 200iSP 184 Operating Instructions 11 2017 A5E00247483 07 ...
Страница 194: ...Maintenance 7 7 Reading service data ET 200iSP 194 Operating Instructions 11 2017 A5E00247483 07 ...
Страница 220: ...Terminal modules 9 6 Terminal module TM RM RM ET 200iSP 220 Operating Instructions 11 2017 A5E00247483 07 ...
Страница 372: ...Glossary ET 200iSP 372 Operating Instructions 11 2017 A5E00247483 07 ...
Страница 384: ...Index ET 200iSP 384 Operating Instructions 11 2017 A5E00247483 07 ...