
Service and maintenance
6.3 Installing and removing electronic components
MicroSAM
Operating Instructions, 06/2012, C79000-G5376-C560-07
93
2.
Rotate the 1.5 mm hexagon socket-head bolt in the cover
②
in the clockwise direction as
far as possible.
WARNING
Tightening the locking screw
According to the explosion protection regulations, all housing covers which have to be
unscrewed to open the housing must each be secured against unintentional opening by
a locking screw
②
.
Before opening, loosen this hexagon socket-head bolt
②
.
Following closing, tighten this hexagon socket-head bolt
②
.
3.
The system parameters must be downloaded when the device is switched on again. The
procedure is described in the "Maxum System Manager" operating software manual.
Содержание MicroSAM
Страница 1: ...Process Gas Chromatography Process Gas Chromatograph MicroSAM Operating Instructions 03 2012 ...
Страница 2: ......
Страница 8: ...Table of contents MicroSAM 6 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 10: ...Purpose of this documentation MicroSAM 8 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 72: ...Mounting 4 4 Mounting and connecting MicroSAM 70 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 78: ...Commissioning and operation 5 5 Shutting down MicroSAM 76 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 106: ...Examples MicroSAM 104 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 114: ...Dimension drawings MicroSAM 112 Operating Instructions 06 2012 C79000 G5376 C560 07 ...