
Commissioning and operation
5.1 Connection of gas lines
MicroSAM
72
Operating Instructions, 06/2012, C79000-G5376-C560-07
5.1
Connection of gas lines
Procedure
1.
Remove the dummy plugs from the gas inlets and outlets "1" to "7" of the chromatograph.
2.
Connect the exhaust and gas lines according to the piping diagram.
5.2
Activating the gas supply
Requirement
All gas lines are connected and leakproof.
Procedure
1.
Turn the carrier gas up to a pressure of 600 to 700 kPa.
2.
Turn the sample gas up to an absolute pressure of ≤ 160 kPa.
3.
If applicable, turn the calibration gas up to an absolute pressure of ≤ 160 kPa.
Содержание MicroSAM
Страница 1: ...Process Gas Chromatography Process Gas Chromatograph MicroSAM Operating Instructions 03 2012 ...
Страница 2: ......
Страница 8: ...Table of contents MicroSAM 6 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 10: ...Purpose of this documentation MicroSAM 8 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 72: ...Mounting 4 4 Mounting and connecting MicroSAM 70 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 78: ...Commissioning and operation 5 5 Shutting down MicroSAM 76 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 106: ...Examples MicroSAM 104 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 114: ...Dimension drawings MicroSAM 112 Operating Instructions 06 2012 C79000 G5376 C560 07 ...