
Commissioning and operation
5.3 Switching on the chromatograph
MicroSAM
Operating Instructions, 06/2012, C79000-G5376-C560-07
73
5.3
Switching on the chromatograph
Requirement
The external power switch is fitted and connected as described in Section "Power switch and
Procedure
Switch on the external power switch.
Response on the display up to release version 4:
Response LED
1.
24 V DC lights up.
2.
Health Status on the right and Health Status on the left light up.
3.
Sample flow and Maint.Reg. flash together until the MicroSAM is ready.
4.
Heartbeat starts to flash when the MicroSAM is ready.
5.
Failure lights up until the temperature and pressure have reached their operating values
and any alarms have been acknowledged.
6.
Ready lights up at the end of the switch-on procedure as soon as the chromatograph is
ready.
Response on the display from release version 09 onwards:
The gas chromatograph starts. The message "Starting... " is output in the text box of the
display. When starting-up has been completed, the message disappears.
Содержание MicroSAM
Страница 1: ...Process Gas Chromatography Process Gas Chromatograph MicroSAM Operating Instructions 03 2012 ...
Страница 2: ......
Страница 8: ...Table of contents MicroSAM 6 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 10: ...Purpose of this documentation MicroSAM 8 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 72: ...Mounting 4 4 Mounting and connecting MicroSAM 70 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 78: ...Commissioning and operation 5 5 Shutting down MicroSAM 76 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 106: ...Examples MicroSAM 104 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Страница 114: ...Dimension drawings MicroSAM 112 Operating Instructions 06 2012 C79000 G5376 C560 07 ...