Smart Infrastructure
A6V10393190_h_en_--
2019-09-01
9
Commissioning
Planning
l
Assign the field devices to the floor plan as per local regulations.
l
Document the panel parameters (see Appendix A).
l
Calculate battery standby time (see chapter 11).
Field installation
l
Install detection lines (detectors and manual call points) and terminate with EOL
element.
l
Install control (sounder) lines and terminate with EOL element.
Panel installation
l
Fire control panel must be mounted.
l
Connect all detection lines or terminate with EOL element.
l
Connect all control lines or terminate with EOL element.
l
Connect alarm and fault dialer.
l
Inscription stripes must be inserted for zone ind. field (optional).
l
Switch off the main supply fuse AC 230 V.
l
Connect the power cable and check the earth connection.
l
Switch on the main supply fuse AC 230 V.
l
Place and connect battery.
l
Fill in and place the provided label at the top, right-hand side of the housing.
Programming
l
Initial start-up of the panel.
l
Program the system and resolve the faults.
Function test
l
Initiate lamp test and check all LED, internal buzzer.
l
Test each device (Detector, MCP, etc.) individually and check the correctness of
the system behavior in terms of outputs (e.g. Sounder, Fire output, etc.).
l
Test fire and fault transmission.
l
Make sure that the panel is in normal operation, the buzzer and all system parts are
enabled.
The system can now be handed over to the customer.
Warning
Pay attention to external voltage (AC 230 V)!