35
Smart Infrastructure
A6V10393190_h_en_--
2019-09-01
4.7
Initial start-up
The initial start-up is required with every new installation.
4.7.1
Prepare the panel
Make sure that the installation instructions, steps 1-8 are fulfilled (chapter 4.2)
and all accessories are connected (chapter 4.6).
1) Switch on the mains supply.
2) Connect the battery.
N
L
Red
(+)
Black
(-)