6
Initial commissioning and demonstration mode
8021386/12G4 /2019-04-24 | SICK
OPERATING INSTRUCTIONS | NAV-LOC
28
Subject to change without notice
6
Initial commissioning and demonstration mode
NOTE
This chapter describes only the initial, first set-up and demonstration process. For further information
refer to chapter 7.
6.1
Initial connection setup
1.
Setting up connections for power supply like described in chapter 7.3 and for the network connec-
tions like described in chapter 7.4.
2.
Open the SOPAS AIR web GUI with a web browser (Chrome is preferred) e. g. with default setting:
for X9-1 from the connected SIM Port