ZEBV-5084A
4
2. Installation Conditions
Be sure to read the installation precautions described below to keep the instrument stable and obtain
reliable acquisition results. Also, follow the precautions given in the Safety Precautions of the instruction
manual that came with the instrument.
2.1 Carry-in route
The instrument can be moved because there are six casters on the instrument underside. Refer to the
instrument dimensions described in 2.2 Example installation so that delivery can be carried out without
problems. Also check the following points. It is recommended to have the carrier check before carrying-in.
If using an elevator, the inside dimension should be at least 2,050 mm in depth, 1,100 mm in width,
and 1,800 mm in height. Also, the frontage should be 1,100 mm in width and 1,800 mm in height.
If the instrument is carried in with a crane, prepare an approach route and the stopping place of the
crane, and the carry-in entrance to the building.
Passage and the corners in the building should have the sufficient width and height to move the
instrument.
2.2
Example installation
Front view
1710
448
397
397
448
Fig.1 Example of installation layout (Front view and Top view) [mm]
Top view
1000
1980
600
(2630)
(1600)
600
50
Rotary pump
Required space
RP power cable
(
1.5m
)
230V Main power supply
cable
(
10m
)
(connect to switchboard)
Exhaust hose
(
5m
)
(connect to duct)
Vacuum piping
(
1m
)
Ar gas piping, N
2
gas piping
(
5m
)
(connect to gas cylinder or piping
in the room)
597
597
180
180
Instrument
710
400
Space required for
maintenance
445
178
211
506
Portable table
(Prepared by the customer)
Control cable
(
0.6m
)
Optical link cable
(
2m
)
445
178
211
506
HUB
LAN cable
(
1m
)
LAN cable
(
1m
)
*A further space of 60cm or more is needed to
the left of the iMScope to allow sufficient space
for maintenance.
*Omitted a cable of PC and a monitor and the
AC100V power supply.
PC for
analyzing
PC for
acquisition
power supply.