2. Installation Conditions 

 
Be sure to read the installation precautions described below to keep the instrument stable and obtain 
reliable acquisition results. Also, follow the precautions given in the Safety Precautions of the instruction 
manual that came with the instrument.       
 

2.1 Carry-in route 

 
The instrument can be moved because there are six casters on the instrument underside. Refer to the 
instrument dimensions described in 2.2 Example installation so that delivery can be carried out without 
problems. Also check the following points. It is recommended to have the carrier check before carrying-in. 

 

If using an elevator, the inside dimension should be at least 2,050 mm in depth, 1,100 mm in width, 
and    1,800 mm in height. Also, the frontage should be 1,100 mm in width and 1,800 mm in height. 

 

If the instrument is carried in with a crane, prepare an approach route and the stopping place of the 
crane, and the carry-in entrance to the building. 

 

Passage and the corners in the building should have the sufficient width and height to move the 
instrument. 

2.2

 Example installation 

 
 

Front view

1710

448

397

397

448

 

Fig.1  Example of installation layout (Front view and Top view) [mm] 

Top view

1000

1980

600

(2630)

(1600)

600

50

Rotary pump

Required space

RP power cable

1.5m

230V Main power supply 
cable

10m

(connect to switchboard)

Exhaust hose

5m

(connect to duct)

Vacuum piping

1m

Ar gas piping, N

2

gas piping

5m

(connect to gas cylinder or piping 
in the room)

597

597

180

180

Instrument

710

400

Space required for 
maintenance

445

178

211

506

Portable table
(Prepared by the customer)

Control cable 

0.6m

Optical link cable

2m

445

178

211

506

HUB

LAN cable

1m

LAN cable

1m

*A further space of 60cm or more is needed to 
the left of the iMScope to allow sufficient space 
for maintenance.
*Omitted a cable of PC and a monitor and the 
AC100V power supply.

PC for 

analyzing

PC for 

acquisition

power    supply. 

Содержание iMScope TRIO

Страница 1: ...ZEBV 5084A Imaging Mass Microscope iMScope TRIO Pre Installation Requirements Installation Preparations Confirmation...

Страница 2: ...on Copyright 2014 Shimadzu Corporation 2 Information in this manual is subject to change without notice and does not represent a commitment on the part of the vendor 3 Any errors or omissions which ma...

Страница 3: ...t requirements 6 2 4 Required power supply 6 2 5 Gas 7 2 5 1 Nitrogen gas 7 2 5 2 Argon gas 9 2 5 3 General precautions 9 2 5 4 Precautions when using high pressure gas cylinder 10 2 6 Exhaust 10 2 7...

Страница 4: ...reparation required at the customer s site in order to facilitate installation of the iMScope TRIO Please make sure that the content of this document is carefully observed to ensure that the instrumen...

Страница 5: ...crane prepare an approach route and the stopping place of the crane and the carry in entrance to the building Passage and the corners in the building should have the sufficient width and height to mov...

Страница 6: ...space for maintenance Place equipment that can be readily moved such as the PC system given in the example to the left of the iMScope TRIO unit and ensure a space of 60cm or more between the iMScope...

Страница 7: ...on of this instrument must be at least 2 3 m high Including space for working provide a W4 m D3 m H2 3 m site Ventilation This instrument uses flammable solvents for auto tuning and uses large amounts...

Страница 8: ...refers to the Shimadzu Corporation part number If power supplies of the above specifications are not available alterations to room power supply capacity will be necessary Required power supplies for e...

Страница 9: ...es and pressures Gas Pressure supplied to iMScope TRIO Type Purity Nitrogen gas N2 99 or greater In case of nitrogen gas generator 97 0 or greater 690 800kPa Argon gas A 99 99 or greater 200 500kPa 2...

Страница 10: ...Prepare the following pressure regulator and pipes given below or equivalent products if using a nitrogen gas cylinder Pressure regulator Part number Description Requirement Remarks 221 35999 01 Press...

Страница 11: ...en supplying gas by centered gas supply as other instruments being used may be affected by the amount of gas supplied If using a cylinder please use 5m or shorter pipes in general carrier gas piping I...

Страница 12: ...e Draft chamber 20m3 min Be sure to install the oil return kit to suppress the decrease in oil in the rotary pump and clean the exhaust gas from a rotary pump The parts which are require for the exhau...

Страница 13: ...a draft chamber during the process of spray coating of the matrix to prevent dispersion of the spray solution of the matrix Dustproof Gasproof mask We recommend you use a Dustproof Gasproof mask duri...

Страница 14: ...ce For measuring the matrix Pipette and pipette tips 100 1000uL Matrix solvent HPLC grade methanol This is also used for cleaning airbrush Milli Q ultrapure water TFA Vortex mixer For agitating the ma...

Страница 15: ...the following pages are a checklist for each of the installation conditions that have been described in this document Please fill out the checklist yourself and pass it on to the appropriate personnel...

Страница 16: ...Screen to avoid direct contact with airflows from air conditioners Humidity 40 to 70 with no condensation Installation space Space for iMScope TRIO Strength Portable table for PC and monitor Stand fo...

Страница 17: ...e situation 3 point power plug for 230V Power strip for PC Monitor 4 Gas N2 nitrogen gas Purity Supply pressure to iMScope TRIO Distance from gas supply source 99 or greater In case of nitrogen gas ge...

Страница 18: ...us Adjustment acceptance Standard samples for instrument adjustment and sensitivity check are required CD R Blank for installation data record is required TFANa 200mL P N 225 06613 08 Standard sample...

Страница 19: ...cable Strait 2pc Others Consumable parts Multimeter is required to distinguish which is the right side of the ITO coated glass slide ITO coated microscope slides and air duster are consumed regularly...

Страница 20: ...hen affixing the sample Because of the instrument composition we can not analyze that part c Section Thickness To avoid the section damage and the instrument trouble we ask you to slice the tissue wit...

Страница 21: ...al Cutting Temperature compound causes sensitivity decline because the polymer adherents to the sections If you cannot avoid using OCT we ask you to make sections outside the OCT as well If you wish t...

Отзывы: