64 Copyright (c) 2000-2009 Acronis. All rights reserved.
Copyright (c) 2009 Seagate Technology LLC. All Rights Reserved.
8.1.4 Setting up weekly execution
If you choose weekly execution, set the Start time, specify the task execution periodicity in
the
Run the task every x week(s) on:
box (every week, every two weeks, etc.) and
select the days on which to execute the task.
8.1.5 Setting up monthly execution
If you select monthly execution, set the Start time and days on which to execute the task:
On the <specify a day>
– on the specified day (e.g. on second Tuesday or fourth
Friday); select this from the drop-down lists.
On every x day of the month
– on the specified date
Содержание BlackArmor NAS 110
Страница 1: ......