![Sea Tel 4009-9 BROADBAND-AT-SEA Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/sea-tel/4009-9-broadband-at-sea/4009-9-broadband-at-sea_installation-manual_1221278024.webp)
4009-9 Installation Manual
Installation
3-2
CAUTION:
The antenna/radome assembly is very light for its size and is subject to large
swaying motions if hoisted under windy conditions. Always ensure that tag lines, attached
to the radome base frame, are attended while hoisting the antenna assembly to its assigned
location aboard ship.
3.3.
Installing the ADE
The antenna pedestal is shipped completely assembled in its radome. Please refer to the entire Site Survey
chapter of this manual.
Base Hatch Access
- Mounting the radome directly on the deck or
platform prevents access to the hatch in the base of the radome unless an
opening is designed into the mounting surface to allow such entry. If there
is no access to the hatch the only way to service the antenna is to remove
the radome top. Two people are required to take the top off of the radome
without cracking or losing control of it, but even with two people a gust of
wind may cause them to lose control and the radome top may be
catastrophically damaged (see repair information in the radome
specifications) or lost.
If access to the hatch cannot be provided in the mounting surface, provide
a short ADE mounting stanchion to mount the ADE on which is tall enough
to allow access into the radome via the hatch.
Ladder rungs must be provided on all mounting stanchions greater than 3-
4 feet tall to allow footing for personnel safety when entering the hatch of
the radome.
Cable Passage - The
radome base is designed with a bottom center cable
passage and Roxtec® Multidiameter® blocks for cable strain relief. The
recommended cable passage in the 50, 60, 61 and 66 inch radomes is
through the bottom center of the radome base, down through the ADE mounting stanchion, through the deck
and into the interior of the ship.
Bottom center cable passage is recommended, however, a strain relief kit is provided with the system if off-center
cable entry is required. Note: Strain relief installation procedure, provided in the Drawings chapter, MUST be
followed to assure that the cored holes are properly sealed to prevent moisture absorption and de-lamination
of the radome base.
3.3.1.
Prepare the 40”, 50”, 60”, 66” or 76” Radome Assembly
1.
Remove the side walls of the radome crate.
2.
Lift the pallet using a forklift and/or jacks.
3.
From the underside of the pallet, remove
the four shipping bolts which attach the
ADE to its’ pallet. Discard this shipping
hardware.
Содержание 4009-9 BROADBAND-AT-SEA
Страница 3: ......
Страница 22: ...4009 9 Installation Manual Site Survey 2 8 This Page Intentionally Left Blank...
Страница 46: ...4009 9 Installation Manual Setup Ships Gyro Compass 5 2 This Page Intentionally Left Blank...
Страница 50: ...4009 9 Installation Manual Setup Band Selection 7 2 This Page Intentionally Left Blank...
Страница 58: ...4009 9 Installation Manual Setup Home Flag Offset 9 6 This Page Intentionally Left Blank...
Страница 70: ...4009 9 Installation Manual Setup Blockage RF Radiation Hazard Zones 11 6 This Page Intentionally Left Blank...
Страница 86: ...4009 9 Installation Manual Functional Testing 15 4 This Page Intentionally Left Blank...
Страница 108: ...4009 9 Installation Manual DAC 2202 Technical Specifications 19 6 This Page Intentionally Left Blank...
Страница 116: ...4009 9 Installation Manual 4009 9 Technical Specifications 20 8 This Page Intentionally Left Blank...
Страница 118: ...4009 9 Installation Manual DRAWINGS 21 2 This Page Intentionally Left Blank...
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 131: ......
Страница 132: ......
Страница 137: ......
Страница 145: ......
Страница 147: ......
Страница 149: ......
Страница 151: ......
Страница 153: ......