20
SBS System – SB-1000 Operation
3) Start Spindle – This screen requests the operator to start the spindle. The
icon and the “RPM” both
flash as a reminder. The control stays on this screen until it senses the spindle is up to constant speed. Then
the screen advances to the Measure screen. The
symbol indicates that the weight locations will be
displayed for review by pressing the
button (go back to Apply Weights screen).
4) Measure – The control measures the new vibration level. The operator should wait for the RPM and
vibration to stabilize then press
button to advance to the next screen. The
symbol flashes as a
reminder. If the balance level is below the Limit, then the balance process is complete and the next screen
displayed is the main screen. Otherwise the control will advance to the Stop Spindle screen of the next phase.
Press
button to back up and show the Apply Weights screens in order to review the last weight changes.