4
SBS System – SB-1000 Operation
System Installation
Control Unit
The SBS Control Unit should be mounted in a location allowing observation of the display by the machine
operator. A variety of mounting hardware is available for installation on vertical surfaces or for rack
mounting.
Rear Panel Connections
The following connections are located on the rear panel of the Control Unit.
1)
POWER SUPPLY. Terminal block connection for power input. 22 VDC to 26 VDC, 3.5A
max at 22 VDC. There is no power switch on the SB-1000, as it is designed for constant
operation. If power must be disconnected by the user, a separate switch on the power line
may be installed at installation.
Caution:
Before applying power to the Control, make sure the supply voltage is within
specified range.
2)
Earth Ground. Connect this M5 stud to the GND.
3)
Optional CNC Interface. Standard DB-25 connector for connecting to a grinding machine
controller. A complete description of this relay based interface is given in the “Hardwire
Interface” section
4)
Balancer/RPM Sensor (labeled 1). 12-pin DIN connection to either the SBS Balancer cable
(Automatic Balance mode) or to the RPM Sensor (Manual Balance mode).
5)
Vibration Sensor (labeled 2). 5-pin DIN connection to Vibration sensor.
6)
USB connection. Allows USB 2.0 connection to host computer for Firmware update of the
control only. Latest firmware for the control and update instructions are available on the SBS
website
https://accretechsbs.com/
.
1
6
4
5
3
2