INSTALLATION AND
PROGRAMMING INSTRUCTIONS
SUNWAY M XS 7500TL
17/
148
3.3.
Transport and Handling
State-of-the-art packing is provided when shipping the SUNWAY M XS. Handling should be done using a
transpallet or a lift truck with a carrying capacity of at least 100 kg, in order not to damage the product.
Get near the installation place, then unpack following the instructions provided below.
CAUTION
The whole original packing is to be kept for the full duration of the
warranty period.
Based on the configuration of the product, the content of the packing may
have a maximum weight of 35 kg. The centre of gravity of the SUNWAY M
XS does not match with the geometrical centre of the packing. It is therefore
recommended that the packing be handled with extreme care by at least
three persons. Always use proper handling equipment.
The product packing contains a form stating the password required for
accessing the functioning data of the equipment. For details about
accessing the inverter functioning data, see section 3.7.2.