Zone setup:
the zone can be named in "position description"; the initialization value
in the figure is "zone 1-N".
Fig 4- 4 Zone setup window
Building setup:
the building can be named in "position description"; the initialization
value in the figure is "building 1-N".
Fig 4- 5 Building setup window
Floor setup:
press OK button to save the setup and exit; press cancel button to
retain the original setup and exit.
Fig 4- 6 Floor setup window