4. Installation preparations
47
CH420:01
© Sandvik SRP AB – Doc. no. S 223.510 en Ver. 1
4.3.3
Electrical installation
Make sure that all local and site-specific requirements for electrical
installations are fulfilled.
External cables, disconnecting switches and fuses must be ordered before
installation. See
section 7. Electrical installation
.
Contact Sandvik for further information about cables, switches and fuses.
4.3.4
Remote control system
At most sites a main control system is used to control the process. Make sure
that the control system is prepared for the addition of the cone crusher.
4.3.5
Process material
Process material wears the cone crusher and adjacent equipment in varying
ways. Sandvik recommends the prior testing of the quality of the material
that is to be processed. Sandvik can assist with such testing.
4.3.6
Dust protection
The inhalation of dust from the process material can cause death or severe
injuries. Sandvik recommends installing dust protection equipment to
prevent dust spreading from the process equipment, see
.
Содержание CH420:01
Страница 1: ...installation manual Doc no S 223 510 SANDVIK CH420 01 ...
Страница 8: ...Table of contents 6 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 ...
Страница 19: ...1 Introduction 17 CH420 01 Sandvik SRP AB Doc no S 223 510 en Ver 1 This page is intentionally left blank ...
Страница 20: ...1 Introduction 18 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 ...
Страница 31: ...29 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 3 Technical data ...
Страница 42: ...3 Technical data 40 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 This page is intentionally left blank ...
Страница 109: ......
Страница 110: ......