![SANDVIK CH420:01 Скачать руководство пользователя страница 71](http://html1.mh-extra.com/html/sandvik/ch420-01/ch420-01_installation-manual_3886010071.webp)
5. Transport handling
69
CH420:01
© Sandvik SRP AB – Doc. no. S 223.510 en Ver. 1
5.4 Moving and storage
If the cone crusher must be stored before installation, make sure that the
storage area meets the requirements in
.
If possible, place the cone crusher and oil tank unit at the installation site
before unpacking. Do not unpack the components until immediately before
starting installation.
Position the packages on the installation site so that the crusher and oil tank
unit can be lifted out and installed without being turned around.
When lifting, follow the instructions in
.
5.4.1
Moving
a) Attach the lifting equipment according to the instructions in
.
b) Lift the component only enough to clear the floor.
c) Make sure that the component remains stable on the lifting equipment.
d) Move the load into position and lower it gently to the floor. Leave
enough room for access to all sides.
e) Make sure that the component is firmly supported.
f)
Remove the lifting equipment.
g) Remove any screws holding the transport platform to the component.
WARNING!
Hanging load
Keep clear of hanging loads. See
.
Make sure that the SWL (Safe Work Load) of the lifting equipment is
sufficient for the weight to be lifted.
Содержание CH420:01
Страница 1: ...installation manual Doc no S 223 510 SANDVIK CH420 01 ...
Страница 8: ...Table of contents 6 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 ...
Страница 19: ...1 Introduction 17 CH420 01 Sandvik SRP AB Doc no S 223 510 en Ver 1 This page is intentionally left blank ...
Страница 20: ...1 Introduction 18 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 ...
Страница 31: ...29 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 3 Technical data ...
Страница 42: ...3 Technical data 40 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 This page is intentionally left blank ...
Страница 109: ......
Страница 110: ......