
6. Mechanical installation and connections
74
© Sandvik SRP AB – Doc. no. S 223.510 en Ver. 1
CH420:01
6.1 General requirements
Personnel
Only qualified installation personnel are authorized to install the cone
crusher. See
for a definition of installation
personnel.
The installation area
a) Clear the installation site. If necessary, clean the ground before starting
the installation.
b) Make sure that there is sufficient room to move safely around the
appendix A: Installation drawings
. If any adjacent
machines on the site cannot be stopped, take measures to prevent
accidental contact.
c) Make sure that the lighting on the installation site is adequate. Use
additional portable lights if necessary.
Lifting equipment, tools and materials
The equipment used for lifting and moving the crusher components can also
be used for unpacking and installing the cone crusher.
See
section 5.1.2 Loading and unloading goods signs
.
Packing
Leave wrapping and ties on the parts until they are ready for use.
Leave the plastic plugs in the oil line openings until they are ready to be
connected, but do not forget to remove them before connecting the pipes.
Содержание CH420:01
Страница 1: ...installation manual Doc no S 223 510 SANDVIK CH420 01 ...
Страница 8: ...Table of contents 6 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 ...
Страница 19: ...1 Introduction 17 CH420 01 Sandvik SRP AB Doc no S 223 510 en Ver 1 This page is intentionally left blank ...
Страница 20: ...1 Introduction 18 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 ...
Страница 31: ...29 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 3 Technical data ...
Страница 42: ...3 Technical data 40 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 This page is intentionally left blank ...
Страница 109: ......
Страница 110: ......