![SANDVIK CH420:01 Скачать руководство пользователя страница 87](http://html1.mh-extra.com/html/sandvik/ch420-01/ch420-01_installation-manual_3886010087.webp)
6. Mechanical installation and connections
85
CH420:01
© Sandvik SRP AB – Doc. no. S 223.510 en Ver. 1
6.6 Over-pressure system
The cone crusher and the oil tank unit are equipped with a common over-
pressure system to exclude dust from the equipment. A correctly functioning
over-pressure system is important for the performance of the crusher.
Normally the system consists of a blower and two hoses: one from the
blower and one from the tank unit. The hoses are joined in a T-connector on
the crusher bottomshell. The lengths of the hoses depend on the position of
the blower and tank unit.
As an alternative to the blower installation, a connection can be made to a
compressed air system via a regulator and a filter. If possible, the regulator
and filter should be installed in a heated space.
CAUTION!
It is important to install the blower in a dust free environment. Dust will
damage the blower and result in malfunction of the cone crusher.
a) The blower (1) can be mounted horizontally or vertically. If a regulator
assembly (2) is used, it must be installed horizontally.
b) When connecting the blower motor, make sure that the direction of
rotation corresponds to the arrow on the blower housing. If the direction
of rotation is incorrect, the output of the blower will be insufficient.
c) Measure the hose lengths required and cut the appropriate lengths from
the hose coil supplied with the crusher.
d) Connect one hose (3) between the crusher T-connection (4) and the hose
coupling on the blower (1) or regulator (2). Use hose clips.
e) Connect a second hose (5) between the crusher T-connection (4) and the
tank over-pressure coupling (6). Use hose clips.
Minimum and maximum length of hoses
2–15 m
Minimum and maximum pressure
600–1000 Pa
Minimum blower capacity at 600 Pa
0.3 m
3
/min
NOTE!
Hoses, pipes and pipe fittings are not supplied by Sandvik.
NOTE!
The air which is introduced into the crusher and the tank must be free from
moisture and dust.
NOTE!
Install the blower or regulator at least 0.5 m above the oil tank unit. This will
prevent oil running back to it from the tank.
Содержание CH420:01
Страница 1: ...installation manual Doc no S 223 510 SANDVIK CH420 01 ...
Страница 8: ...Table of contents 6 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 ...
Страница 19: ...1 Introduction 17 CH420 01 Sandvik SRP AB Doc no S 223 510 en Ver 1 This page is intentionally left blank ...
Страница 20: ...1 Introduction 18 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 ...
Страница 31: ...29 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 3 Technical data ...
Страница 42: ...3 Technical data 40 Sandvik SRP AB Doc no S 223 510 en Ver 1 CH420 01 This page is intentionally left blank ...
Страница 109: ......
Страница 110: ......