Ver.
CHAPTER 2. Installation of RRH-P4
2-6
© SAMSUNG Electronics Co., Ltd.
2600-00CTEIGAA
4.0
2.4.2 Cable Gland Assembly and Cabling Procedure
Follow the cable gland assembly instructions below to prevent influx of moisture and
foreign substances.
Figure 2.4 Cable Gland Assembly and Cable Installation Procedure (1)
1) Check the cable gland built on the unit whether it has the protection cover inside the cable gland nut
as shown in the picture below (cross-section picture of outer wall of the unit), the same as the original
factory configuration..
3) Remove the protection cover (circular transparent plate) and keep it separately.
[Cross-section]
Protection Cover
Cable Gland Nut
2) Separate the cable gland nut by loosening counterclockwise.
Here, check the protection cover (circular transparent plate).
Protection Cover
Cable Gland Nut
[Loosened Cable Gland Nut]
Protection Cover
[Removed Protection Cover]
Содержание Smart MBS RRH-P4
Страница 1: ...Ver 2600 00CTEIGAA 4 0 Smart MBS RRH P4 Installation Manual ...
Страница 116: ...Ver ANNEX B Feeder Line Work B 10 SAMSUNG Electronics Co Ltd 2600 00CTEIGAA 4 0 This page is intentionally left blank ...
Страница 158: ...Ver ANNEX F Standard Torque F 2 SAMSUNG Electronics Co Ltd 2600 00CTEIGAA 4 0 This page is intentionally left blank ...