Ver.
CHAPTER 2. Installation of RRH-P4
2-26
© SAMSUNG Electronics Co., Ltd.
2600-00CTEIGAA
4.0
2.8 Connecting Hybrid cable
2.8.1 Installing Hybrid cable
Follow the steps below to install the hybrid cable.
1) Unpack the box. (A-D)
2) Pull up the tower. (E-F)
Figure 2.18 Installing Hybrid cable (1)
A) Use a crowbar to open the wooden box cover.
After opening the cover, ensure to remove the remaining nails as they may cause injury.
B) Hold both ends of the hybrid cable and lift it out of the box. Tape the power cable and optic cable
separately at 3.28 ft (1 m) interval. Also, tape the exposed optic connector to prevent damage.
3.28 ft
(1 m)
...
Tape
3.28 ft
(1 m)
Cover
Crowbar
Wooden Box
Содержание Smart MBS RRH-P4
Страница 1: ...Ver 2600 00CTEIGAA 4 0 Smart MBS RRH P4 Installation Manual ...
Страница 116: ...Ver ANNEX B Feeder Line Work B 10 SAMSUNG Electronics Co Ltd 2600 00CTEIGAA 4 0 This page is intentionally left blank ...
Страница 158: ...Ver ANNEX F Standard Torque F 2 SAMSUNG Electronics Co Ltd 2600 00CTEIGAA 4 0 This page is intentionally left blank ...