Ver.
Smart MBS RRH-P4 Installation Manual/Ver.3.0
© SAMSUNG Electronics Co., Ltd.
2-29
2600-00CTEIGAA
4.0
Figure 2.21 Installing Hybrid cable (4)
F) Fix the cable to the hoisting wire with a cable tie at regular intervals [within 3.28 ft (1 m)] to prevent
impact or tension to the upper side of the junction box when lifting the hoist.
Maintain hoisting wire in a straight line, separate the RRH-side cable’s curve from the hoisting wire
with 5.9 in. (150 mm) or more distance. And fix cable and wire with cable tie.
(When lifting the hoist, be careful not to apply tension to other areas of the hybrid cable except where
the pulling wire is attached.)
Max. 3.28 ft (1 m)
Junction Box
(Breakout Point)
Pulling Wire
Hoisting Wire
Max. 3.28 ft (1 m)
Max. 3.28 ft (1 m)
Hoisting Wire
Hybrid Cable
More than 5.95 in.
(150 mm)
Содержание Smart MBS RRH-P4
Страница 1: ...Ver 2600 00CTEIGAA 4 0 Smart MBS RRH P4 Installation Manual ...
Страница 116: ...Ver ANNEX B Feeder Line Work B 10 SAMSUNG Electronics Co Ltd 2600 00CTEIGAA 4 0 This page is intentionally left blank ...
Страница 158: ...Ver ANNEX F Standard Torque F 2 SAMSUNG Electronics Co Ltd 2600 00CTEIGAA 4 0 This page is intentionally left blank ...